The Boring Company
Unicorn Β· $5.7BLas Vegas, US Β· 726 employees on LinkedIn Β· 21 known investors
Find your way into The Boring Company
970 people in our graph share verified history with the The Boring Company team β schools, employers, funds. One of them is your warm intro.
The Boring Company designs and constructs underground tunnel systems, including the Loop, an all-electric public transportation network, and develops tunnel-boring machines like Prufrock to accelerate large-scale infrastructure construction.
Also known as TBC
Founders & leadership
Investors Β· 21
Also in the syndicate Β· 5
Funding
SEC filings, press & company announcements- Undisclosed amountSeries CApr 2022
Sequoia Capital (lead), Vy Capital (lead), 8VC, Brookfield, Craft Ventures, Dacra, DFJ Growth, Founders Fund, Lennar, Tishman Speyer, Valor Equity Partners
Source β
Source: company announcements and press reports β follow each round's link for the claim.
Valuation Β· disclosed
Disclosed eventsSource: SEC prospectus filings, and round valuations the company or its investors disclosed β follow each entry's link for the claim.
Company profile
researched Aug 2026The Boring Company (TBC) designs and builds transportation, utility and freight tunnels, positioning tunnels as a way to add capacity beneath cities without consuming surface land. Its passenger product, Loop, is an all-electric, zero-emissions underground system in which vehicles carry passengers directly to their destination without intermediate stops, functioning more like an underground express highway than a subway. The company also develops its own tunnel boring machines in the Prufrock series, which are designed to launch from and re-emerge at the surface ("porpoising"), install precast tunnel segments while mining, and operate remotely with no personnel in the tunnel.
TBC's operating footprint centers on Las Vegas. The LVCC Loop, a 3-station, 1.7-mile system built in roughly one year at a firm-fixed price of about $47 million, opened in April 2021 and reduced a 45-minute cross-campus walk at the Las Vegas Convention Center to about two minutes; it was expanded in 2024 to 2.1 miles and five stations. Connectors to Resorts World (2022), Westgate (2024) and Encore at Wynn (2025) extended the broader Vegas Loop, which the company reports has carried more than 4 million passengers across 11 stations, with Clark County and the City of Las Vegas having approved 68 miles of tunnel and 104 stations. Additional projects include the Music City Loop in Nashville (under construction, in partnership with the State of Tennessee), a contracted pilot phase of Dubai Loop with the Dubai Roads and Transport Authority (6.4 km of tunnel and four stations, construction beginning late 2026), the Cybertunnel at Tesla's Austin Gigafactory, seven R&D tunnels across Hawthorne and Adelanto, California and Bastrop, Texas, and a short Hyperloop test tunnel in Bastrop.
Founding story
The Boring Company was founded by Elon Musk to change how transportation infrastructure is built, with the stated aims of solving traffic, beautifying cities by moving transport underground, and enabling rapid point-to-point travel.
Business model
The Boring Company contracts with public agencies, resort and real estate owners, and industrial customers to design and construct tunnels, and operates the resulting Loop passenger systems. Projects have been delivered on fixed-price terms (the LVCC Loop was contracted at approximately $47 million firm-fixed price), and the Music City Loop in Nashville is described as a privately funded system. The company also sells branded merchandise such as hats, T-shirts and mugs through an online shop.
Revenue derives from tunnel construction contracts and the operation of Loop transportation systems, alongside a consumer merchandise store with items priced from $25 to $500.
Traction
More than 4 million passengers transported on Vegas Loop across 11 open stations; approvals in place from Clark County and the City of Las Vegas for 68 miles of tunnel and 104 stations. LVCC Loop has demonstrated peak capacity of over 4,500 passengers per hour and more than 32,000 passengers per day, and was expanded in 2024 to 2.1 miles and five stations. Seven R&D tunnels have been built in three cities, and four student Hyperloop competitions hosted with SpaceX produced pods reaching up to 288 mph.
Latest developments
On March 10, 2026, Prufrock-2 completed a 2.28-mile tunnel near Westgate Las Vegas, reported as the longest single Vegas Loop tunnel drive to date. In July 2026, The Wall Street Journal reported the company was in talks to raise roughly $4 billion at a $20 billion valuation, a round that had not closed and whose terms could change; reports indicated proceeds would go toward the Nashville and Dubai projects. Construction of the Dubai Loop pilot (6.4 km, four stations) is slated to begin in late 2026.
βΈFull profile β market position, technology, go-to-market, geography, history, risks & controversies
Market position
The company describes Vegas Loop as the largest subsurface transportation project in the United States, contrasting its planned mileage with the less than 20 miles of underground subway tunnel built in the U.S. over the previous 20 years. Press coverage frames it as moving from a single-city operator toward a multi-region infrastructure business, with reported project pitches in Baltimore, Chicago and Los Angeles in addition to Nashville and Dubai.
TBC builds both the tunnels and the boring machines, pursuing much shorter construction timelines and lower costs than conventional tunneling: the Encore connector took under 10 weeks from site access to tunnel completion, and LVCC Loop tunneling proceeded during conventions with over 100,000 attendees without road closures or disruption. Loop's no-intermediate-stop, express architecture is contrasted with subway and light-rail systems, and porpoising retrieval lets tunnels terminate within tens of feet of building entrances without cranes or retrieval pits.
Technology
The core technology is the Prufrock series of tunnel boring machines, designed to mine at up to one mile per week β about six times faster than the company's earlier Godot-Plus TBM β with Prufrock-3 targeted at higher speeds. Key design features are porpoising (launching from and re-emerging at the surface, enabling tunneling to start within 48 hours of arrival on site and craneless retrieval without a pit), continuous mining that installs precast segments while advancing, and ZPIT (Zero People in Tunnel) autonomous remote operation. The Loop system uses all-electric, zero-emission vehicles running point-to-point through the tunnels; Hyperloop, a proposed extension of the architecture, envisions autonomous electric pods at 600+ mph and has been tested via a vacuum-pump test tunnel in Bastrop, Texas.
Go-to-market
TBC secures approvals and contracts directly with local governments and transport authorities and with private venue owners, using completed reference systems in Las Vegas as proof points for further expansion; it recruits directly through its careers site, offering salaries, health benefits and equity.
Municipal and regional governments and transport authorities (Clark County and the City of Las Vegas, the State of Tennessee, Dubai's Roads and Transport Authority), resort and casino operators and convention venues (Las Vegas Convention Center, Resorts World, Westgate, Encore at Wynn), industrial and manufacturing sites (Tesla's Austin Gigafactory), and end-user passengers riding Vegas Loop.
Geography
Headquarters in Las Vegas, Nevada. Operating and under-construction systems in Las Vegas (Vegas Loop, LVCC Loop and the Resorts World, Westgate and Encore connectors); Nashville, Tennessee (Music City Loop, under construction); Austin, Texas (Cybertunnel at Tesla Gigafactory); R&D tunnels in Hawthorne and Adelanto, California and Bastrop, Texas, where a Hyperloop test tunnel also sits; and a contracted pilot project in Dubai, UAE.
History
By its April 2022 Series C announcement, TBC said it had spent five years building core technologies for Loop and Hyperloop. Its first commercial system, the LVCC Loop, opened in April 2021 for the Mecum Motorcycle Auction. Clark County commissioners unanimously approved the 29-mile, 51-station Vegas Loop on October 20, 2021; approved scope later grew to 68 miles and 104 stations. The Resorts World connector opened in 2022, the Westgate connector in 2024 (alongside the LVCC Loop expansion), and the Encore connector in 2025. A Hyperloop test tunnel was built in Bastrop in 2022. Press reporting states the company spun out of SpaceX in 2018.
Risks & controversies
Press coverage notes that tunnel workers have suffered serious injuries and that Nevada regulators said in 2025 that The Boring Company violated environmental regulations nearly 800 times. The reported $4 billion / $20 billion-valuation round had not closed as of the reporting, leaving final terms uncertain.
Compiled by commissioned research from 8 cited public sources β announcements, filings, and press listed under research sources below.
Key figures
latest reportedCompany-reported or press-reported figures, each dated to when it was claimed β not independently audited.
Founder mafia
3 people who came through The Boring Company went on to found or lead other companies.
Competitors Β· 4
by search overlapCompanies competing with The Boring Company for the same Google search keywords, organic and paid, via search-intersection analysis.
Timeline Β· 13
launches, deals, and filingsThe Wall Street Journal, as reported by TechCrunch, said the company was in talks for a $4 billion round valuing it at $20 billion; the deal had not closed and terms could change.
$4B source β
Reported as the longest single Vegas Loop tunnel drive to date.
Contract to build the pilot phase of Dubai Loop: 6.4 km of tunnel and four stations, with construction to begin in late 2026.
The State of Tennessee and The Boring Company partnered on a privately funded underground Loop system connecting downtown Nashville, Music City Center and Lower Broadway to West End Ave and Nashville International Airport; status under construction.
Purpose-built tunnel moving finished Cybertrucks from the production line to a staging area across an 8-lane state highway, providing a 60-second underground connection in place of a 12-minute surface drive; constructed with the Prufrock-3 machine.
Connector between the Las Vegas Convention Center's Center Hall and Encore Resort at Wynn, with a transit time of approximately 55 seconds; construction took less than 10 weeks from site access to tunnel completion and ended with a craneless porpoise retrieval.
Press coverage reported that Nevada regulators said the company violated environmental regulations nearly 800 times, and that tunnel workers had suffered serious injuries.
The Westgate connector opened in 2024, built with a Prufrock-series machine that porpoised out of the ground without a crane or retrieval pit, terminating less than 100 feet from Westgate's front door; the LVCC Loop was expanded to 2.1 miles and five stations with the addition of Riviera and Central Plaza stations.
Round led by Vy Capital and Sequoia Capital with participation from Valor Equity Partners, Founders Fund, 8VC, Craft Ventures, DFJ Growth and real estate partners Brookfield, Lennar, Tishman Speyer and Dacra; proceeds earmarked for hiring across engineering, operations and production and for Prufrock R&D.
$675M source β
A short Hyperloop tunnel was constructed in 2022 in Bastrop to test vacuum pump systems.
Connector linking Resorts World on the Las Vegas Strip with all other Vegas Loop stations, with travel times of 2 to 5 minutes.
Commissioners approved a 29-mile tunnel network connecting 51 stations, described by the company as the largest subsurface transportation project in the United States.
The 3-station, 1.7-mile LVCC Loop opened in April 2021 for the Mecum Motorcycle Auction, built in approximately one year and reducing a 45-minute cross-campus walk at the Las Vegas Convention Center to about two minutes.
Dated company events from announcements, filings, and press; legal rows summarize public dockets and regulator releases.
In the news
βΈResearch sources Β· 8
primary sources listed
- The Boring Companyboringcompany.com Β· web
8 public sources were cited for this profile; the first-party ones are listed here.
Frequently asked questions
- What does The Boring Company do?
- Tunneling company building underground Loop transit systems and Prufrock boring machines, with an operating network in Las Vegas.
- Who founded The Boring Company?
- The Boring Company was founded by Elon Musk.
- Who are The Boring Company's investors?
- The Boring Company's investors include 8VC, Alpha Wave Global, Aurum Venture Partners, Coatue Management, DBL Partners, Dreamers VC, Founders Fund, Gigafund and 8 more.
- Where is The Boring Company headquartered?
- The Boring Company is headquartered in Las Vegas, US.












