Fundraising Fox

Radiant

Unicorn Β· $1.8B

Founded 2020 Β· 28 known investors

radiantnuclear.com β†—

Radiant Nuclear develops Kaleidos, a portable nuclear microreactor designed to replace diesel generators for remote locations and provide resilient backup power to hospitals, datacenters, and military installations.

Also known as Radiant Industries Β· Radiant Nuclear

Deep TechEnergyHardware

Founders & leadership

DB
Doug BernauerFounder & CEO

Investors Β· 28

Also in the syndicate Β· 6

ARK Venture FundGiant VenturesHanwha Asset Management Venture FundSGAStepStoneWashington Harbour Partners

Funding

SEC filings, press & company announcements

$300M disclosed across 1 of 3 rounds Β· 2025

Source: company announcements and press reports β€” follow each round's link for the claim.

Valuation Β· disclosed

Disclosed events
$1.8Bvaluation at Series DDec 2025
filing β†—

Source: SEC prospectus filings, and round valuations the company or its investors disclosed β€” follow each entry's link for the claim.

Company profile

researched Aug 2026

Radiant (Radiant Nuclear) is a nuclear energy company based in El Segundo, California, founded in 2020, that is developing Kaleidos, a 1 MW electric portable nuclear microreactor intended as a replacement for diesel generators. The unit packages a reactor, shielding, turbomachinery and cooling equipment into a transportable container that can be moved by truck on highway routes or by aircraft, and the container can be separated into sections for transport and maintenance. Radiant states the design requires no site excavation and can reach full power the day after being lowered from the truck.

Kaleidos uses TRISO fuel (ceramic-coated uranium particles) and helium as the heat transfer gas, with an air jacket that cools the core passively by natural convection and no on-site water requirement, relying on fans for air cooling. Alongside 1 MW of electricity, the company says the unit can supply 1.9 MW of thermal power for facility heating or water desalination, and that its turbomachinery operates efficiently between 30% and 100% of rated power to support microgrids. Fuel is depleted after five or more years of operation, after which the container is returned to the factory; Radiant states a unit can be refueled a total of four times for a 20-year product lifetime, leaving no nuclear waste or infrastructure on site. Fleet operations are supported by a centralized 24/7 monitoring system that streams data from deployed units.

Radiant's first reactor is the Kaleidos Demonstration/Development Unit (KDU), to be tested at Idaho National Laboratory's Demonstration of Microreactor Experiments (DOME) facility, with testing targeted for summer 2026; the company describes this as the first new commercial reactor design to achieve a fueled test in over 50 years. Initial customer deployments are planned for 2028. The company is also developing an R-50 production factory in Oak Ridge, Tennessee, sized to produce up to 50 microreactors per year.

Business model

Radiant sells power and hardware to commercial and defense customers, offering purchase either through Power Purchase Agreements (PPAs) or direct unit sales, with factory assembly, fueling and testing of units before deployment and return of containers to the factory for refueling. The company plans mass manufacturing at a dedicated factory rather than bespoke on-site construction.

Direct sales of Kaleidos units and Power Purchase Agreements; reservations/deposits have been taken (for example, deposits accompanying a 20-reactor order).

Traction

Reported milestones include selection by DOE for HALEU fuel allocations (including a second allocation in July 2026), a first DOE HALEU supply contract, a binding commercial HALEU enrichment contract with Urenco, an agreement with the Defense Innovation Unit and the Department of the Air Force for a microreactor at a U.S. military base, a 20-reactor deal with deposits from Equinix, receipt of the first TRISO fuel shipment at INL's DOME facility in July 2026, shipment of the Kaleidos reactor to DOME in August 2026, a TRISO supply agreement with Standard Nuclear through the early 2030s, and NRC acceptance of an accelerated review of a 10 CFR Part 70 license for the R50 production facility in Tennessee. Cumulative venture funding reached $225 million after the Series C and more than $525 million implied following the December 2025 round.

Latest developments

In August 2026 Radiant announced a TRISO fuel supply agreement with Standard Nuclear covering planned Kaleidos deployments through the early 2030s, and said its reactor had departed for Idaho National Laboratory's DOME facility. In July 2026 the DOE selected Radiant for a second HALEU allocation to support the first commercial microreactor at a U.S. military installation, and Radiant received its first TRISO fuel shipment at DOME, ahead of a five-phase testing program targeting more than 150 hours at full power without operator intervention. In May 2026 the NRC launched an accelerated review of Radiant's 10 CFR Part 70 license for its R50 production facility in Tennessee.

β–ΈFull profile β€” market position, technology, go-to-market, geography, history, risks & controversies

Market position

Radiant positions itself as a pioneer in mass-produced portable nuclear microreactors and was one of five U.S. companies selected by DOE to receive HALEU fuel, one of 11 companies in the federal Nuclear Reactor Pilot Program, and the first new U.S. reactor design slated to be tested at INL's DOME facility. Press coverage places it among a group of well-funded nuclear startups raising nine-figure rounds amid data-center-driven power demand, and reported a valuation of more than $1.8 billion in December 2025.

Radiant emphasizes factory mass production of a standardized, containerized reactor rather than site-built plants; zero on-site water use through air cooling; passive natural-convection core cooling intended to simplify regulatory approval; helium coolant that does not become radioactive; meltdown-resistant TRISO fuel; deployment without excavation and full power the day after delivery; more than 110 times the energy density of existing diesel systems; and removal of the entire unit at end of fuel life so no waste remains on site.

Technology

Helium-cooled microreactor using TRISO ceramic-coated uranium fuel, rated at 1 MW electric and 1.9 MW thermal, with high-speed turbomachinery efficient from 30% to 100% power. Helium does not become radioactive, and a passive air jacket cools the core by natural convection; no on-site water is required. The design is containerized for road or air transport, factory-fueled and tested, refuelable four times over a stated 20-year lifetime, and monitored remotely through a centralized fleet-monitoring system. Fuel is high-assay low-enriched uranium (HALEU) sourced under DOE allocations and commercial enrichment contracts.

Go-to-market

Radiant markets reservations directly via its website and pursues government and enterprise channels: a Department of Defense agreement with the Defense Innovation Unit and the Department of the Air Force for a microreactor on a U.S. military base, participation in DOE programs (HALEU allocations, DOME testing, the President's Nuclear Reactor Pilot Program), and commercial contracts such as a 20-unit agreement with Equinix.

Military installations and defense users, data centers and digital infrastructure operators, hospitals and disaster/emergency response, remote villages and remote industry, and other critical infrastructure requiring resilient off-grid or backup power.

Geography

Headquartered in El Segundo, California. Demonstration reactor testing at Idaho National Laboratory's DOME facility in Idaho; planned R-50 production factory in Oak Ridge, Tennessee. Commercial activity includes a HALEU enrichment contract with Urenco signed at the U.S. embassy in London.

History

Radiant was founded in 2020 and is based in El Segundo, California. By August 2022 it described its goal as bringing one of the world's first factory-constructed microreactors to market with the Kaleidos 1 MW unit. In May 2025 it published its "Atoms For Prosperity" master plan and closed a $165 million Series C, bringing total venture funding to $225 million, following DOE selection as one of five companies to receive HALEU fuel. In December 2025 it raised more than $300 million led by Draper Associates and Boost VC ahead of breaking ground on its Oak Ridge, Tennessee factory. Through 2026 it progressed toward its first reactor test: NRC accelerated review of its Tennessee production facility license (May 2026), first TRISO fuel shipment received at INL's DOME facility (July 2026), a second DOE HALEU allocation (July 2026), shipment of the reactor to DOME (August 2026), and a TRISO fuel supply agreement with Standard Nuclear (August 2026).

Risks & controversies

TechCrunch coverage notes the wave of nine-figure nuclear fundraises tied to data-center power demand and raises the question of a sector bubble, suggesting a possible winnowing if startups fail to deliver on first-reactor milestones; it also notes that reaching criticality on a first-of-a-kind unit does not guarantee successful replication at manufacturing scale. Radiant's own writing describes regulatory barriers on materials, prescriptive rules and rigid timelines as obstacles for reactor developers.

Compiled by commissioned research from 8 cited public sources β€” announcements, filings, and press listed under research sources below.

Key figures

latest reported
Energy density vs diesel systemsJan 2025Over 110 times the energy density of existing diesel systems
HeadcountAug 2026566
Kaleidos electrical outputJan 20251 MW electric
Kaleidos thermal outputJan 20251.9 MW thermal
Operating range of turbomachineryJan 202530% to 100% of rated power
Planned factory output capacityMay 202550 microreactors per year
Product lifetimeJan 202520 years
Reactors ordered by EquinixDec 202520 units
Refueling intervalDec 20255 years
Total venture funding to dateMay 2025$225M
ValuationDec 2025$1.8B

Company-reported or press-reported figures, each dated to when it was claimed β€” not independently audited.

Competitors Β· 6

by search overlap
Interestingengineering113 shared keywordsInteresting Engineering is an online media publication covering news and analysis on engineering, science, and technology topics including nuclear energy, semiconductors, robotics, quantum computing, and defense. It offers articles, columns, case studies, and research along with a subscription for ad-free access.
Nano Nuclear Energy110 shared keywordsNANO Nuclear Energy is a vertically integrated company developing advanced portable microreactor technology, including the KRONOS MMR, spanning reactor design, safety analysis, fuel cycle facilities, and licensing. Publicly listed on NASDAQ, it serves the advanced nuclear energy sector.
X-Energy Website100 shared keywordsX-energy develops advanced nuclear energy technology, including small modular high-temperature gas reactors and TRISO fuel. Its reactors are designed to supply electricity and high-temperature steam for utilities and energy-intensive heavy industry.
TerraPower91 shared keywordsTerraPower develops advanced nuclear reactors and related technologies to generate carbon-free electricity and heat for industrial decarbonization, while also producing radioisotopes for medical cancer treatments. The company addresses climate change and energy security through innovative nuclear technology.
Powermag75 shared keywordsPOWER is a trade media publication covering the electric power generation industry, reporting on power plants, grid infrastructure, energy regulation, and related technology. It publishes news, white papers, and webinars for professionals in the power and energy sector.
Oklo59 shared keywordsOklo develops next-generation fast fission reactors for producing clean electricity at scale, with a focus on safety features and the ability to use recycled nuclear waste as fuel. The company's Aurora reactor is designed to generate up to 75 megawatts of electrical power.

Companies competing with Radiant for the same Google search keywords, organic and paid, via search-intersection analysis.

Non-dilutive funding Β· 4 SBIR/STTR awards

Federal grants β€” no equity taken
AgencyPhaseYearAmount
U.S. Air ForceAir ForcePhase II2023$1.2M
Department of EnergyPhase IISTTR2023$1.1M
Department of EnergyPhase I2022$199.2K
U.S. Air ForceAir ForcePhase I2021$45.3K

Source: SBIR.gov award data (U.S. Small Business Administration). SBIR/STTR awards are competitive federal R&D grants and contracts β€” non-dilutive capital alongside any venture rounds above.

Timeline Β· 14

launches, deals, and filings
Aug 2026
TRISO fuel supply agreement with Standard Nuclear through early 2030s

Agreement secures fuel for planned Kaleidos deployments through the early 2030s as part of an end-to-end supply chain.

source β†—

Aug 2026
Kaleidos reactor en route to INL DOME facility

source β†—

Jul 2026
DOE selects Radiant for second HALEU allocation

Allocation supports the planned first commercial microreactor at a U.S. military installation.

source β†—

Jul 2026
First TRISO fuel shipment received at INL's DOME facility

Receipt of fuel clears the path to full-power, full-temperature testing under a five-phase program targeting more than 150 hours at full power without operator intervention.

source β†—

May 2026
NRC launches accelerated review of Part 70 license for R50 factory in Tennessee

Nuclear Regulatory Commission begins accelerated review of Radiant's 10 CFR Part 70 license application for its R50 production facility in Tennessee.

source β†—

Dec 2025
Radiant raises more than $300M led by Draper Associates and Boost VC

Round valuing the company at more than $1.8 billion supports commercialization scaling and groundbreaking on the R-50 factory in Oak Ridge, Tennessee.

$300M source β†—

Aug 2025
Equinix agrees to purchase 20 Kaleidos microreactors

Deal with deposits signed with data center developer Equinix for 20 reactors.

source β†—

May 2025
Radiant publishes 'Atoms For Prosperity' master plan

source β†—

May 2025
Radiant closes $165M Series C led by DCVC

Series C brings total venture funding to $225 million; proceeds primarily fund completion of the Kaleidos Development Unit and factory siting and early construction.

$165M source β†—

May 2025
DOE selects Radiant among five companies to receive HALEU fuel

Radiant selected by the U.S. Department of Energy as one of five U.S. companies to receive high-assay low-enriched uranium for the first Kaleidos test at INL's DOME facility.

source β†—

Jan 2025
Executive hires including Chief Nuclear Officer and Chief Revenue Officer

Dr. Rita Baranwal, former Assistant Secretary for Nuclear Energy, joined as Chief Nuclear Officer; Dr. Mike Starrett joined as Chief Revenue Officer; nearly a dozen VP and Director hires across engineering, manufacturing and supply chain.

source β†—

Jan 2025
Agreement with Defense Innovation Unit and Department of the Air Force for microreactor on a U.S. military base

Described as the first deal for mass-manufactured nuclear microreactors on a U.S. military base.

source β†—

Jan 2025
Binding commercial HALEU enrichment contract with Urenco

Described as the first binding commercial contract by a U.S. advanced reactor developer for Western commercial HALEU enrichment services; signed at the U.S. embassy in London.

source β†—

Jan 2025
Selected for the President's Nuclear Reactor Pilot Program

One of 11 companies selected for a federal program that speeds approval timelines rather than providing grants or loans.

source β†—

Dated company events from announcements, filings, and press; legal rows summarize public dockets and regulator releases.

In the news

β–ΈResearch sources Β· 8

primary sources listed

8 public sources were cited for this profile; the first-party ones are listed here.

Frequently asked questions

What does Radiant do?
Radiant builds Kaleidos, a factory-produced 1 MW portable nuclear microreactor intended to replace diesel generators.
Who are Radiant's investors?
Radiant's investors include Acequia Capital (AceCap), Andreessen Horowitz, Beyond Capital, Cantos Ventures, Carbon, Crosscut Ventures, DCVC (Data Collective), Decisive Point and 14 more.
How much funding has Radiant raised?
Radiant has disclosed $300M raised across 1 of its 3 known rounds.